Whitchurch Leisure Centre/Swimming Pool

The centre has been designed by Architects Roberts Limbrick. The centre will be over two floors. The ground floor will accommodate the café, changing rooms and swimming pool. Upstairs there will be a 41-station gym with state-of-the-art equipment and a studio space.

Demolition was completed in November 2024 and works have been well underway since. The building is now starting to take shape and the external works are almost complete.

The is built with sustainability in mind, achieving a BREEAM score of ‘Excellent’.  It will be an energy efficient building, recycling, and waste reduction during construction and re use of a Brownfield site and enhancing biodiversity.

PSG managed the project with the appointed Design Team:

Main Contractor – Pellikaan

Architect – Roberts Limerick

M&E Consultants – CGP MEP Ltd

Electrical – Barrie Beard Ltd

Mechanical – Design Installation Services Ltd

Whitchurch swimming pool
Before works
before works
Site clearance

New pool area